6. Commissioning, operation
CAUTION!
Mount the resistance thermometer from below when a horizontal pipeline is only
partially lled in operation.
Before commissioning the thermowell, clean it in accordance with the cleaning
specications of the plant.
WARNING!
Use appropriate sealing material. The sealing must be checked regularly by the plant
operator.
The thermowell must not be bent or altered in order to mount it. The tting should be carried
out such that there can be no damage to the thermowell as a result of the plant operation or the
operator. If necessary, one of the thermowell/pipeline mountings mentioned below (e.g. with
pipe clamps) will be required. In particular, the neck should be secured by appropriate methods
against bending.
7. Information on mounting and operation in hazardous areas (Europe)
7.1 General information on explosion protection
The requirements of the 94/9/EC (ATEX) directive must be followed. Additionally the
specications of the respective national regulations concerning Ex usage apply.
A) The responsibility for classication of zones lies with the plant operator and not the
manufacturer/supplier of the equipment.
B) The plant operator guarantees, and is solely responsible, that all thermometers in use are
identiable with respect to all safety-relevant characteristics. Damaged thermometers may not
be used. Repairs may only be completed using original spare parts from the original supplier;
otherwise the requirements of the approval are not fullled.
The manufacturer shall not be responsible for constructional modications after delivery of the
instruments.
C) If a component of electrical equipment, on which the explosion protection depends, is
repaired, then the electrical equipment may only be put back into use, after an authorised
expert has stated that it corresponds to the fundamental characteristics of the requirements for
explosion protection. In addition this expert must provide a certicate for this and provide the
equipment with a test mark.
D) Item C) shall not apply if the component was repaired by the manufacturer in accordance with
the requirements and regulations.
6. Commissioning, operation / 7. Information on mounting ...