Wika CPC2000 Manuel d'utilisateur Page 22

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 132
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 21
22 WIKA operating instructions, model CPC2000
11155094.02 07/2012 GB/D/F/E
GB
6. Commissioning, operation
Phase Description
1 Wait for the Start command with SELECT
2 Delay time can be dened in the Conguration
4 Duration of the system zero point adjustment
7 Hold time at the zero point
9 Time to control up to the next step
10 Hold time
13 Delay time at the maximum set pressure
15 Time to control up to the next step
16 Delay time at the zero point
18 The delay times can be dened in the conguration.
Between phases 10 and 16, the calibrator data can be evaluated and recorded if a stable
value is displayed. The AUTO mode can be exited by pressing the MENU button. VENT
will be shown In the top left of the display.
6.4 Leakage (LEAK)
In CTRL mode, the connected test item can be checked for leakage via LEAK button.
Setting
In order to be able to check a test item for leakage, the instrument must rst be placed in
CTRL mode.
Set the desired pressure using the / button or the / button (0 %/100 %)
buttons.
As soon as the pressure is reached and the value is stable, press the LEAK button.
The internal pump will be switched o and the applied pressure will be held.
Operation
Operating mode
Elapsed time
since start of the
Leak function
Measured value
Actual deviation from
the set value
Percentage deviation from the set value
Pressure unit
Set pressure demand
Vue de la page 21
1 2 ... 17 18 19 20 21 22 23 24 25 26 27 ... 131 132

Commentaires sur ces manuels

Pas de commentaire